The old floor was used as patterns for cutting the new floor from 3/4″ marine plywood. After cutting the 4 sections, we coated top, bottom and outside edges with epoxy. After domino’ing the 4 sections together, we epoxied the joined edges again. The new floor was connected to the frame using elevator bolts.